Brzeće 14.07.2021. On the section of the road Brzeće – Kopaonik, works are being carried out on the replacement of curbs and construction of gutters until July 30, 2021. year, in the period from 07:00 to 16:00.

The works are provided with temporary traffic signals and equipment, and the traffic takes place by alternately passing vehicles.